Hoza Load Bank Quality Assurance System
Precision Delivers Stability | Accuracy Guarantees Credible Test Data
1. Our Quality Philosophy
Load banks are core testing equipment that safeguards power system safety. Our full lifecycle quality management complies with IEC 60204-1 and GB/T 2423, guided by three core principles:
Durable Over-Spec Design
All products reserve a 20% safety margin above rated values to extend service life under harsh operating environments.
Example: Our 100kW 400V 3P4W resistive load bank (5kW single-step, ±1kW loading accuracy) uses Delixi RT18-32 10A fuses.
All-Round Safety Protection
Integrated hardware & software safety mechanisms: overheat, low airflow, fan interlock, phase sequence, emergency stop, overcurrent and overvoltage protection.
Traceable Measuring Precision
Strict component screening and factory calibration achieve ±3% loading accuracy and ±0.5% energy meter display accuracy.
2. R&D & Design Control
We adopt simulation-assisted design to optimize cabinet layout, component safety margin and heat dissipation channels, effectively lowering hot spot temperature during long-hour full-load operation.
Standardized, clearly labeled structural design with complete circuit diagrams supports flexible power customization and quick on-site fault maintenance.

3. Incoming Material Quality Control
We cooperate with top-tier component suppliers globally for stable raw material performance:
Resistors: Nickel-chromium finned resistors, low temperature drift and efficient heat dissipation
Contactors & breakers: Schneider, ABB
Fuses: Delixi, Sinofuse; Relays: Omron
Every heating resistor passes 100% incoming resistance testing via UNI-T UT890D+ multimeter, with deviation controlled within±1.1%, far better than the±3% industry standard.

4. Standardized Production & In-Process Inspection
All production lines follow unified SOPs with dedicated quality checkpoints:
Uniform resistor arrangement with double fastening inspection for smooth airflow
Reliable high-current terminal crimping, loop resistance spot-checked by micro-ohmmeter
Standardized labeled wiring, full continuity and insulation testing
Pre-assembly power-on test to check fan operation and abnormal noise

5. 100% Full Factory Acceptance Test (FAT)
Every finished load bank undergoes complete testing with an official FAT report issued:
Visual & internal cabinet inspection, free of debris, scratches or deformed parts
Busbar tightness, insulation resistance and high-voltage withstand tests
Full verification of all safety protection functions
Complete local & remote control test: parameter display, stepped loading, data curve and log export
Loading accuracy verification & calibration for voltage, current, power and power factor

6. Complete Traceability & Document Support
Each unit carries an exclusive serial number with a full digital file archive:
Design drawings, BOM and component batch information
Signed inspection records from all production stations
Full official FAT test report
Lifelong accessible after-sales technical support

7. Export-Grade Packaging & Delivery
Internal shockproof, moisture-proof EPE foam + solid export wooden crates to avoid damage during long-distance sea and land transportation.
Each shipment is equipped with operation manuals, conformity certificates, FAT reports and circuit diagrams. Electronic copies of all documents are available upon request.

Our Quality Commitment
Quality control at Hoza is a closed-loop, continuously optimizing system rather than isolated inspection steps. We supply high-stability, high-precision load banks with traceable test data and reliable long-term after-sales service worldwide.